01 · HOW IT WORKS

Four steps.
One active power plant.

Here is what it looks like for you: what you know before you decide, what we install, and what happens next.

01Order

You get
the numbers first

A fixed installation price and an estimated gain right away. The agreement comes to you for signing, and nothing starts before you have signed.

02Installation

We mount the
control units

Small units on the heating, cooling and ventilation you already have. Certified installer, done in a few hours. No rebuilding and no construction site.

03Operation

The platform
controls intelligently

Automatic optimisation by electricity prices, grid tariffs and the building's profile — always within the limits you set for temperature and indoor climate.

04Follow-up

You follow
the gain

Live dashboard and a monthly report in Enlink OS. You see what the building actually delivered, measured against your own metering data.

02 · SPECIFICATIONS

What you can typically
expect from day one.

Your grid tariff is measured by the building's highest hour. That peak is what we shave — and it is why the gain starts in the first month.

01Reduced capacity chargeup to 50%
02Reduced energy costs15 to 30%
03Paid back within1 to 3 yrs
Run the numbers for your building
03 · WHAT YOU GET

One box.
Three revenue streams.

01

Reduced
grid costs

We shave the peaks and cut the capacity-charge component of your grid tariff.

02

Load
shifting

Consumption is shifted to periods with lower electricity prices through intelligent control.

03

The flexibility
market

Resources are aggregated and delivered into the markets, so you earn from the flexibility you already have.

Is your building an
undiscovered power plant?

Get started in minutes and see what the resources in your building are worth.

QUESTIONS AND ANSWERS

Frequently asked questions.

Is my building suitable?

The building needs technical systems we can control, typically heating, hot water, cooling, ventilation or charging. We run the numbers on buildings from 100,000 kWh a year and up, and today we operate offices, commercial buildings, industry, warehousing, hotels and retail.

What gets installed, and who does it?

Small control units on your technical systems, mounted by a certified installer. Done in a few hours.

Is the building's operation affected?

No. We shift and adjust consumption, but only within safe, predefined limits for temperature and indoor climate. The result is lower cost without anyone using the building noticing.

What if it doesn't produce a gain?

The installation price is fixed and binding, so the cost is known before you sign. The gain is documented against your own metering data in Enlink OS, month by month, and Enlink's share of the agreement is calculated from documented gains.

Is there a lock-in?

No. You own the system yourself and can end the agreement whenever you want. Add-on packages can be switched on and off freely.

Who sees my data?

Only you and Enlink. Metering data is used exclusively to control the system and document your gains.